100% (1)
page:
4 pages/≈1100 words
Sources:
3
Style:
APA
Subject:
Management
Type:
Essay
Language:
English (U.S.)
Document:
MS Word
Date:
Total cost:
$ 17.28
Topic:

Module 4 - Case WRAPPING UP

Essay Instructions:
Hi Writer, As we spoke about please, please make sure you read all instructions and use citation. Please reference order #0184659 through #0185119 If needed. Module 4 - Case WRAPPING UP Assignment Overview Multidisciplinary and Transdisciplinary Teams Project Managers will work with different teams comprising diverse members. The case will look at an array of teams Case 4 Resources 1) Strategy and Effective PM (2022) https://ecampusontario(dot)pressbooks(dot)pub/essentialsofprojectmanagement/chapter/2-4-strategy/ 2) Roles of Project Manager (2022) https://ecampusontario(dot)pressbooks(dot)pub/essentialsofprojectmanagement/chapter/12-3-roles-of-project-manager/ 3) Project Manager Characteristics (2022) https://ecampusontario(dot)pressbooks(dot)pub/essentialsofprojectmanagement/chapter/12-4-project-manager-characteristics/ 4) Managing the Team (2022) https://ecampusontario(dot)pressbooks(dot)pub/essentialsofprojectmanagement/chapter/12-5-managing-the-team/ Case Assignment Working with Project Teams Multidisciplinary Research best practices for working with multidisciplinary teams. (1 page) Transdisciplinary Research best practices for working with transdisciplinary teams. (1 page) Global/International Research best practices for working with global/international teams. Sources must have been published in the last year. (1 page) Remote Research best practices for working with remote teams. Sources must have been published in the last year. (1 page) No quotations are permitted in this paper. Each paragraph (except the introduction and conclusion) must contain at least one in-text citation. Since you are engaging in research, cite and reference the sources in APA format. NOTE: Failure to use research with accompanying citations to support content will result in reduced scoring “Level 2-Developing” on the grading rubric. This is a professional paper, not a personal one based on feelings. It must be written in the third person. This means words like “I,” “we,” and “you” are not appropriate. Assignment Expectations Use the attached APA-formatted template (PRM490 Case 4) to create your submission. The template is set up in APA 7: double-spacing, font, margins, headings, page breaks, APA help links. Your submission will include: Trident University International’s cover page A paper with APA citations (2- to 3-sentence project overview, 4-page body, 2- to 3-sentence conclusion) The reference list page in APA format
Essay Sample Content Preview:
PRM490 Case 4 Your Name Trident University International PRM490 Project Management Integration Due Date PRM490 Case 4 Multidisciplinary The office building construction project, which is 2000 sq. ft, involves designing, structural engineering, electrical and plumbing systems, procurement, project management, and meeting all zoning and environmental regulations. Effective structuring of multidisciplinary team collaboration is necessary to adequately manage a multidisciplinary team with effective and productive contributions from these disciplines but without the waste caused by misalignment (Broft & Pryke, 2019). The project will implement a Building Information Modeling (BIM) system to optimally coordinate among multidisciplinary members during the design development of the building. BIM integrates architectural blueprints, structural load calculations, and mechanical, electrical, and plumbing (MEP) designs, thus preventing architectural conflicts between structural beams, HVAC ducts, and others from being discovered only when construction is underway, and extra work is necessary. This is also coupled with weekly multidisciplinary coordination meetings on RMG to review and make decisions on ongoing progress based on the structured decision-making with the RACI matrix (Responsible, Accountable, Consulted, Informed) (Tiovanen, 2017). Since multidisciplinary teams sometimes experience role ambiguity, a detailed work breakdown structure (WBS) will be utilized to demarcate the scope of the responsibilities that architects, engineers, contractors, and procurement specialists would handle. Furthermore, applying the Lean Construction methodologies (e.g., the Last Planner System (LPS)) would reduce workflow inefficiency by the scheduled tasks only, while the prerequisite activities are achieved first to reduce delays and rework. It also places special importance on interdisciplinary knowledge sharing. Since design integrity may hold the highest priority for engineers and architects and cost efficiency for procurement teams, in the context of design decisions, a collaborative decision matrix will be used in order to evaluate the design choices in terms of cost-effectiveness, regulatory compliance, energy efficiency, and long term operational sustainability (Othman & Youssef, 2021). This structured decision-making approach ensures the multidisciplinary team stays on a common goal: creating a cost-effective, high-quality, and compliant office building. Transdisciplinary Through the office building project transdisciplinary collaboration is incorporated in the office building project by team members co-creating solutions by integrating expertise in different disciplines instead of working in isolated silos. It effectively solves sustainability goals, energy savings, and modular construction innovation. As part of the project, co-design workshops will be held to develop trans-disciplinary teamwork based on the engineers, architects, energy consultants, and construction managers to brainstorm ways to advance energy conservation, construction material selection, and cost optimization. Throughout this, one specific application of transdisciplinary collaboration will be in designing a solar panel integrated roofing system (Fardous, 2024). Structural engineers, electrical engineering students, and sustainability experts will jointly evaluate roof load-bearing capacity, energy output efficiency, and financial return on investment. Additionally, innovative building technologies will be integrated into IoT-based smart building technologies to improve long-term resilience and operational efficiency. The project can include data analysts and tech pros to facilitate real-time occupancy sensors and automatic lighting systems, which reduce energy consumption. The Delphi Method will be used to structure the decision-making process based on the idea that experts from various domains will offer iteration feedback on the solutions until there is agreement ...
Updated on
Get the Whole Paper!
Not exactly what you need?
Do you need a custom essay? Order right now:

👀 Other Visitors are Viewing These APA Essay Samples:

Sign In
Not register? Register Now!