Essay Available:
page:
1 pages/≈275 words
Sources:
0
Style:
MLA
Subject:
Technology
Type:
Research Paper
Language:
English (U.S.)
Document:
MS Word
Date:
Total cost:
$ 6.48
Topic:
Research Assignment Paper: Mesquite and Vado Interchange
Research Paper Instructions:
Chapter 11 Homework
Read: Pages 37-39 & Chapter 11.1 of the textbook & Vermont’s Project Prioritization Process (Supplemental Readings)
Find a state DOT or an MPO (not Vermont or CCRPC) website, and find their project scoping (or “planning” or “development”) page and write 2-3 paragraphs on a scoped project for the area you selected.
Research Paper Sample Content Preview:
Name:
Instructor:
Course:
Date:
I-10/Mesquite and Vado Interchange
New Mexico Department of Transportation is undertaking a major project in District 1. This is a project that involves the replacement of the steel girder bridges with concrete bridge. The concrete bridge will have full height abutments artwork that will feature some local southwestern theme and precast concrete deck panels.
The project is expected to make some major changes to the existing bridge. There will be some major changes on the ramps to take on a diamond interchange. This will be after the removal of the loop ramps that are existing on the current bridge. The element of reconfiguration will bring about the provision of acceleration lanes that are much longer which will be on I-10.
To help the drivers to better make use of the interchange, the project will incorporate the use signals that will be placed strategically where all the drivers can see them. This is a crucial part of the project in light of enhancing the safety of the interchange. It is common with road users that where a road is redesigned drivers tend to have a hard time figuring out the various sections and how to make use of them during their commute. In this case the signaling will be placed at Avenida de Mesilla as wel...
Instructor:
Course:
Date:
I-10/Mesquite and Vado Interchange
New Mexico Department of Transportation is undertaking a major project in District 1. This is a project that involves the replacement of the steel girder bridges with concrete bridge. The concrete bridge will have full height abutments artwork that will feature some local southwestern theme and precast concrete deck panels.
The project is expected to make some major changes to the existing bridge. There will be some major changes on the ramps to take on a diamond interchange. This will be after the removal of the loop ramps that are existing on the current bridge. The element of reconfiguration will bring about the provision of acceleration lanes that are much longer which will be on I-10.
To help the drivers to better make use of the interchange, the project will incorporate the use signals that will be placed strategically where all the drivers can see them. This is a crucial part of the project in light of enhancing the safety of the interchange. It is common with road users that where a road is redesigned drivers tend to have a hard time figuring out the various sections and how to make use of them during their commute. In this case the signaling will be placed at Avenida de Mesilla as wel...
Get the Whole Paper!
Not exactly what you need?
Do you need a custom essay? Order right now:
👀 Other Visitors are Viewing These APA Essay Samples:
-
LIDAR and SfM Photogrammetry Research Assignment Paper
1 page/≈275 words | No Sources | MLA | Technology | Research Paper |
-
Artificial Intelligence Research Assignment Paper
6 pages/≈1650 words | 6 Sources | MLA | Technology | Research Paper |
-
Will Robots Be Used In Normal Life, Will They Have Their Own Thoughts?
4 pages/≈1100 words | 4 Sources | MLA | Technology | Research Paper |