Essay Available:
Pages:
1 pages/≈275 words
Sources:
4
Style:
APA
Subject:
Literature & Language
Type:
Essay
Language:
English (U.S.)
Document:
MS Word
Date:
Total cost:
$ 3.6
Topic:
Develop a Procurement Plan
Essay Instructions:
2.Assemble the following:
◦Project scope statement.
◦Project product or service description.
◦Outsourcing market conditions (types of contractors you will need).
◦Any constraints or assumptions to your project that affect solicitation planning.
3.Assume you examined the cost benefits of a "make or buy" decision and have decided to outsource.
4.Create a procurement management plan to include the following:
◦Best types of contracts for your project.
◦How estimates will be obtained from vendors.
◦Operating procedures between the project team and the contracting office (or procurement office). This will include who initiates the purchase request, which office handles the purchase orders, invoicing, etc.
Add a abtract
Essay Sample Content Preview:
Running head: Procurement plan
Procurement plan for a Construction project
Name:
Subject:
College:
Instructor:
Date:
Abstract
The purpose of this procurement plan is to secure a contractor who qualifies to ensure the construction of a high-quality, custom home within five months at cost not to exceed $150,000 is met. The contractor should be qualified in all directions that being in terms of professional and experience, legal requirements and permits, to have attained the lower bid in terms of the project total cost. Procurement is therefore defined as the process of services and goods acquisition from an external source (Northern Texas University, 2007).
Project objective
To construct a high-quality, custom home within five months at cost not to exceed $150,000
Deliverables
The contractor should ensure:
1 A 2500-square-foot house incorporating a kitchen, a sitting room, 2-bedrooms and washroom.
2 A sheet-rocked and insulated finished garage.
3 Decent and modern gas furnace.
4 Inclusion of kitchen appliances including microwave, oven, dishwasher and a range.
Constraints and technical requirements
1 The building should meet seismic stability conditions
2 The structure must adhere to local codes of construction
3 A 21 "A" insulation factor must be met for the exterior wall
4 38 "R" ceiling-insulation factor must be met
5 Garage to have the capacity to house two small-size cars
...
Procurement plan for a Construction project
Name:
Subject:
College:
Instructor:
Date:
Abstract
The purpose of this procurement plan is to secure a contractor who qualifies to ensure the construction of a high-quality, custom home within five months at cost not to exceed $150,000 is met. The contractor should be qualified in all directions that being in terms of professional and experience, legal requirements and permits, to have attained the lower bid in terms of the project total cost. Procurement is therefore defined as the process of services and goods acquisition from an external source (Northern Texas University, 2007).
Project objective
To construct a high-quality, custom home within five months at cost not to exceed $150,000
Deliverables
The contractor should ensure:
1 A 2500-square-foot house incorporating a kitchen, a sitting room, 2-bedrooms and washroom.
2 A sheet-rocked and insulated finished garage.
3 Decent and modern gas furnace.
4 Inclusion of kitchen appliances including microwave, oven, dishwasher and a range.
Constraints and technical requirements
1 The building should meet seismic stability conditions
2 The structure must adhere to local codes of construction
3 A 21 "A" insulation factor must be met for the exterior wall
4 38 "R" ceiling-insulation factor must be met
5 Garage to have the capacity to house two small-size cars
...
Get the Whole Paper!
Not exactly what you need?
Do you need a custom essay? Order right now: