Unit V Course Project. Project Plan. Management Assignment.
Unit V Course Project
Project ScheduleIn this unit, you are required to complete the Project Schedule section of the project plan. Refer to your unit lesson (from this unit and last unit) and required unit resources to advance your project plan. For this assignment, create the components listed below.4. Project Schedule: Include the duration estimates for all project activities, their activity networks, the project critical path, and estimated project duration.• 4.1 Activity Duration Estimates: Include a table with activity number, activity, predecessors, optimistic duration, most likely duration, pessimistic duration, and estimated duration. Be sure to show your paths as well as the critical path.• 4.2 Gantt Chart: Show the task, duration, predecessors, and the schedule leveling.• 4.3 Activity Network: Be sure to include fully completed nodes, including early start, early finish, late start, late finish, and activity float/slack.This assignment should be a minimum of two pages in length, not counting the title page and reference page. Be sure to use proper APA formatting. Citations are not required; however, if outside sources are used, make certain to provide in-text citations and references in APA format. For more elaboration on what you should include in your project plan, refer to pp. 539–542 in your textbook.
Running head: ASS SCHEDULE1
ASS Schedule
Student Name
College/University Affiliation
ASS SCHEDULE
2
ASS Schedule
4. Project Schedule
The ASS concept is a complex, multi-phased project. Tasks, activities, costs and schedules are expected to experience differential delays or, conversely leads to a diversity of opportunities, challenges and constraints discussed in earlier project proposal, plan and work breakdown structure (WBS) documents. The planing of ASS schedule should, accordingly, proceed cautiously and account for understandable controllable and uncontrollable emerging and/or existing complexities and variables. The following graphs and representations are informed by such understanding of current project’s complexity and should not, as such, be accepted as final yet as only indicatory of project’s overall schedule and duration. The following sections include: (i) Basic Activity Network Diagram (BAND), (ii) Predecessor Task/Activity Table, (iii) Complete Activity Network Diagram Without Activity Nodes (CAND-W/O ANs),
* Complete Activity Nodes, (v) Activity Duration Estimates & Estimated Duration, (vi) Critical Path, and (vii) Gantt Chart.
4.1. Basic Activity Network Diagram (BAND)
This diagram, shown in Figure 1 below, shows major Tasks and Activities in ASS according to project’s “Aerial Solar System – Project Proposal,” “Project Plan,” and “WBS, RAM, Work Authorization & Work Charter” documents.
ASS SCHEDULE
3
-191770320675
Figure 1
Basic Activity Network Diagram (BAND)
Start project
Design
Manufacture
Pilot
Fully Implement
Apply Five Year
Freely Install
Warranty
Apply Post Sales
End project
Technical Support
Apply Annual
Maintenance
Apply Quality
Assurance
4.2. Predecessor Task/Activity Table
The BAND, shown in Figure 1, is, as noted, only schematic. The assignment of predecessors, i.e. Tasks/Activities preceding shown ones, as well as most likely duration for each Task/Activity, is required in order to proceed to Complete Activity Network Diagram Without Activity Nodes (CAND-W/O ANs). The following is, accordingly, a more detailed listing of Tasks/Activities in ASS project:
ASS SCHEDULE
4
Activity
Description
Predecessors
Most Likely Duration
A
Market research
None
8 months
B
Start project
A
6 months
C
Identify specifications
B
3 months
D
Design
C
4 months
E
Identify manufacturer
D
6 months
F
Manufacture
E
3 months
G
Pilot (limited scale)
F
1 month
H
Pilot (full scale)
G
2 months
I
Fully implement
H
6 months
J
Freely install
I
1 week
K
Apply five year warranty
J
5 years
L
Apply post sales technical support
J
5 years
M
Apply annual maintenance
J
5 years
N
Apply quality assurance
J
5 years
O
End project
J
3 months
4.3. Complete Activity Network Diagram Without Activity Nodes (CAND-W/O ANs) The Predecessor Task/Activity Table makes possible developing a more complete
activity network. For current purposes, an activity network is developed, initially in Figure 2, without including activity nodes for effective visual illustration and, eventually in Figure 3, including detailed activity nodes.
ASS SCHEDULE
5
-518795343535
Figure 2
Complete Activity Network Diagram Without Activity Nodes (CAND-W/O ANs)
A. Market
B. Start
C. Identify
D. Design
E. Identify
F. Manufacture
Research
Project
Specifications
Manfacturer
* End Project
K. Apply Five
Year Warranty
L. Apply Post
Sales Technical
Support
M. Apply Annual
Maintenance
N. Apply Quality
Assurance
G. Pilot
(Limited Scale)
H. Pilot
J. Freely Install
I. Fully
Implement
(Full Scale)
ASS SCHEDULE
4.4. Complete Activity Nodes
Early Start
A
Early Finish
Activity Float
Market Reserach
Late Start
8 Months
Late Finish
Early Start
B
Early Finish
Activity Float
Start Project
Late Start
6 Months
Late Finish
Early Start
C
Early Finish
Activity Float
Identify
Specifications
Late Start
3 Months
Late Finish
Early Start
D
Early Finish
Activity Float
Design
Late Start
4 Months
Late Finish
2637790-3248025
6
Early Start
E
Early Finish
Activity Float
Identify Manfacturer
Late Start
6 Months
Late Finish
Early Start
F
Early Finish
Activity Float
Manufacture
Late Start
3 Months
Late Finish
Early Start
G
Early Finish
Activity Float
Pilot (Limited Scale)
Late Start
1 Month
Late Finish
Early Start
H
Early Finish
Activity Float
Pilot (Full Scale)
Late Start
2 Months
Late Finish
1794510-39865301823085-2228215
ASS SCHEDULE
Early Start
I
Early Finish
Activity Float
Fully Implement
Late Start
6 Months
Late Finish
Early Start
J
Early Finish
Activity Float
Freely Install
...
👀 Other Visitors are Viewing These APA Essay Samples:
-
Interactive Case (Disruptive Innovation at BBVA). Management
1 page/≈275 words | No Sources | APA | Management | Other (Not Listed) |
-
Project Plan Part 5 Management Research Coursework
5 pages/≈1375 words | No Sources | APA | Management | Other (Not Listed) |
-
Annotated Bibliography Management Research Coursework
3 pages/≈825 words | No Sources | APA | Management | Other (Not Listed) |