Essay Available:
page:
10 pages/≈2750 words
Sources:
-1
Style:
Harvard
Subject:
Accounting, Finance, SPSS
Type:
Essay
Language:
English (U.S.)
Document:
MS Word
Date:
Total cost:
$ 46.8
Topic:
Project Development and Operation Assignment
Essay Instructions:
Instructions:
1. at least 15 references, please strictly follow the Havard reference form and indicate the source in the reference list at the end of the paper
2. Please complete the paper according to the structure provided. I will give you sample essays along with the structure
3. Word count does not include a reference list or table of contents
4. The Turnitin check rate is less than 10%
Essay Sample Content Preview:
RESTORATION AND RENOVATION (R+R) OF OLD CHANGI HOSPITAL INTO A HERITAGE AIRBNB ACCOMMODATION FACILITY IN HALTON ROAD, CHANGI, SINGAPORE
Name of Student
Course
Name of Professor
University
Date
Table of Contents
TOC \o "1-3" \h \z \u Scope PAGEREF _Toc200905851 \h 4
Time PAGEREF _Toc200905852 \h 4
Cost PAGEREF _Toc200905853 \h 5
Objectives PAGEREF _Toc200905854 \h 5
A. Project Plan PAGEREF _Toc200905855 \h 5
1 Background PAGEREF _Toc200905856 \h 5
2 Importance of Preservation PAGEREF _Toc200905857 \h 6
B. Available Funding PAGEREF _Toc200905858 \h 7
C. General Information PAGEREF _Toc200905859 \h 7
D. Table 1: Key Project Phases and Milestones PAGEREF _Toc200905860 \h 8
E. Table 2: Project Team Appointment PAGEREF _Toc200905861 \h 8
F. Table 3: Project Contractor Appointment PAGEREF _Toc200905862 \h 8
G. Heritage Conservation Compliance PAGEREF _Toc200905863 \h 9
H. Table 4: Heritage Conservation Guidelines PAGEREF _Toc200905864 \h 9
I. Table 5: Renovation and Budget Estimation PAGEREF _Toc200905865 \h 10
J. Renovation and Explanation on Terms PAGEREF _Toc200905866 \h 10
1. Structural Assessment and Stabilization PAGEREF _Toc200905867 \h 10
2. Restoration of Heritage Features PAGEREF _Toc200905868 \h 11
3. Sustainable Modernization (Green Mark Certification Goals) PAGEREF _Toc200905869 \h 11
4. Interior Space Conversion PAGEREF _Toc200905870 \h 12
5. Electrical and Mechanical Systems PAGEREF _Toc200905871 \h 12
6. External Landscaping and Access Improvement PAGEREF _Toc200905872 \h 13
7. Final Inspection and Certification PAGEREF _Toc200905873 \h 13
K. Organizational Chart of the Company PAGEREF _Toc200905874 \h 14
Table 6: Activity Definition and Sequencing Worksheet PAGEREF _Toc200905875 \h 14
Project Initiation PAGEREF _Toc200905876 \h 14
Detailed site inspection and feasibility analysis PAGEREF _Toc200905877 \h 14
L. Figure 1: Estimated Project Time by Gantt Chart PAGEREF _Toc200905878 \h 15
M. Table 7: Proposed Payment Method and Schedule PAGEREF _Toc200905879 \h 15
N. Table 8: Cash Flow Forecast PAGEREF _Toc200905880 \h 16
O. Table 9: Risk Management Plan PAGEREF _Toc200905881 \h 17
P. Figure 2: Project Overview PAGEREF _Toc200905882 \h 17
Q. Project Handover PAGEREF _Toc200905883 \h 18
1. Final Walkthrough PAGEREF _Toc200905884 \h 18
2. Client Feedback Collection PAGEREF _Toc200905885 \h 18
3. Formal Document Submission PAGEREF _Toc200905886 \h 18
4. Handover of Keys and Access PAGEREF _Toc200905887 \h 18
5. Training and Orientation PAGEREF _Toc200905888 \h 19
6. Maintenance Guidelines PAGEREF _Toc200905889 \h 19
7. Closure Meeting PAGEREF _Toc200905890 \h 19
8. Post-Handover Support Plan PAGEREF _Toc200905891 \h 20
Conclusion PAGEREF _Toc200905892 \h 21
Reference List PAGEREF _Toc200905893 \h 23
Restoration and Renovation (R+R) of Old Changi Hospital into a HeritageAirbnb Accommodation Facility in Halton Road, Changi, Singapore
Scope
The renovation restores the building’s architectural integrity for use as a Heritage Airbnb accommodation. It includes foundation stabilization, facade cleaning, window and balcony repairs, and complete MEP system upgrades. Interior spaces are redesigned for Airbnb functions while retaining heritage features. Landscaping and accessibility enhancements ensure the building’s operational functionality and aesthetic appeal.
Time
The project commences on 20 June 2025 and concludes on 19 May 2026, spanning 12 months. Phases include initiation, planning, execution, and handover. Each milestone, structural reinforcement, restoration, system installations, and interior work, follows a carefully managed schedule. Regular progress reviews ensure on-time completion and effectively address unforeseen challenges.
Cost
The total budget is USD 5 Million, funded through private investments and government heritage grants. Allocations cover structural repairs, facade restoration, system modernization, and sustainable features. A contingency fund addresses unforeseen issues. Financial monitoring, regular reporting, and strict cost controls ensure that the project is delivered within the approved budget.
Objectives
* To preserve and restore the building’s original architectural design.
* To adapt interiors for Airbnb use, maintaining heritage features.
* To upgrade all mechanical, electrical, and plumbing systems.
* To ensure full compliance with Singapore heritage regulations.
* To achieve Green Building Index certification.
* To complete the project on time and within budget.
* To strengthen Changi’s heritage tourism sector.
A. Project Plan
1 Background
The chosen building is the old Changi Hospital, a colonial-era hospital at 24 Halton Road, Singapore. The building was constructed in 1935 by the British Royal Air Force and features whitewashed walls, louvered windows, deep verandas, and an elevated three-story design characteristic of early 20th-century institutional buildings. The building was used as a military hospital during World War II and then by the Singapore Armed Forces and has been vacant since 1997. Its reuse as an Airbnb-type heritage accommodation maintains its historical integrity and promotes sustainable cultural tourism.Minimal ornamentation includes decorative moldings, an arched pediment with an oval window, and a small wrought iron balcony, contributing to rich architectural diversity (Murtza et al., 2021). Years of tropical weather, sunlight, and pollution have caused structural cracks, corrosion, weathered window frames, and faded paint. The outdated electrical, mechanical, and plumbing systems no longer meet modern standards. The project aims to restore the building into a Heritage Airbnb accommodation, preserving its architectural character while upgrading its functionality. As Fahim and Mou (2024) highlight, conserving such unique structures supports cultural diversity and strengthens Singapore’s tourism sector by attracting both domestic and international visitors.
2 Importance of Preservation
Conserving historic buildings plays a crucial role in protecting Singapore’s architectural identity and cultural history. These structures reflect the diverse influences that have shaped the city’s development over the past century. According to Fahim and Mou (2024), preserving these buildings sustains the city’s cultural narrative while contributing to economic growth through heritage tourism. Tourists are increasingly drawn to destinations that feature authentic historical architecture, generating long-term financial benefits for local businesses and the tourism sector. Additionally, as Bullen and Love (2011) emphasized, adaptive reuse projects support environmental sustainability by minimizing demolition waste and preserving embodied carbon already invested in the original construction materials. Restoration efforts reduce the demand for new construction resources, lowering the project’s overall carbon footprint and promoting responsible urban development (United Nations, 2015). Preserving these structures also enhances community identity and maintains the city’s unique architectural landscape for future generations.
B. Available Funding
The estimated total project cost is USD 5 Million. The Singapore government supports such heritage projects through tax incentives and grants aligned with its sustainability and tourism development goals (Sasongko et al., 2024). Private investors are also contributing to the funding, recognizing the commercial potential of a Heritage Airbnb accommodation in a prime tourist location. The project aligns with Singapore’s Green Technology Master Plan 2005–2030, which emphasizes the integration of sustainable technologies into development projects (Tay, 2023). Green certification goals, such as the Green Building Index (GBI), will guide energy-efficient designs, water conservation, and environmentally responsible construction practices.
C. General Information
* Project Name: Restoration and Renovation (R+R) of Old Changi Hospital into a Heritage Airbnb Accommodation Facility
* Start Date: June 2025
* Final Inspection and Handover Period: May 2026
* Estimated Cost: USD 5 Million
* Building Function: Heritage Airbnb accommodation
D. Table 1: Key Project Phases and Milestones
Phase
Start Date
End Date
Key Activities
Milestone
Initiation
20 June 2025
19 July 2025
Define project scope, feasibility study, permits
Project approval and budget confirmation
Planning
20 July 2025
19 August 2025
Detailed design, regulatory compliance
Final design approval
Execution
20 August 2025
19 April 2026
Restoration, renovation, systems installation
Restoration completion
Closure
20 April 2026
19 May 2026
Final inspection, handover, post-project evaluation
Project handover
E. Table 2: Project Team Appointment
Appointment
Person-in-charge
Contact
Email
Project Manager
Mr. John Tan
+60 12 3456 789
[email protected]
Asst Project Manager
Ms. Alicia Wong
+60 13 2345 678
[email protected]
Budget and Finance
Mr. Samuel Lim
+60 11 9876 543
[email protected]
Risk Manager
Ms. Nur Aisyah
+60 10 9988 776
[email protected]
F. Table 3: Project Contractor Appointment
Company Name
Position
Contact
Email
Studio Lapiz
Heritage Architect
+60 9382 5555
[email protected]
GreenBuild Solutions
Sustainability Consultant
+60 9382 8888
[email protected]
StructSafe Engineering
Structural Engineer
+60 9382 9999
[email protected]
Elite Electrical
Electrical Contractor
+60 9382 7777
[email protected]
G. Heritage Conservation Compliance
The building is listed under Singapore’s broader architectural conservation program, which aims to protect structures contributing to the city’s cultural and architectural diversity. While the building does not adhere to the typical Straits Chinese or singapole’s tradition, its neoclassical European-inspired design reflects the historical influence of foreign merchants, administrators, and urban planners who shaped parts of Changi during the colonial and post-colonial periods (Soon, 2017; Said et al., 2013). In compliance with the National Heritage Act 2005 and the guidelines issued by Suaib et al. (2020), the renovation will prioritize minimal intervention and reversibility. It means that key architectural features, such as the symmetrical facade, the arched pediment with the oval window, the clean window framing, and the simple yet elegant balcony railings, will be carefully preserved. Any interventions will avoid permanent alteration of these elements. All necessary plans for restoration have been submitted to the relevant heritage authorities for approval prior to construction.
H. Table 4: Heritage Conservation Guidelines
Aspect
Permitted Changes
Non-Negotiable Requirement
Façade
Gentle cleaning, repainting using approved neutral color tones
Original window placements and facade symmetry preserved
Roof
Replacement of damaged roof tiles with identical red metal sheets
Maintain original roof slope, dormer windows, and drainage lines
Windows
Refurbish wooden or metal frames; replace broken glass with safety glass
Maintain original window sizes, shapes, and mullion patterns
Air Conditioning
Install internal concealed systems
No external condenser units visible from the street
Balcony
Reinforce balcony structure where necessary
Preserve original wrought iron design
Interior Layout
Modify interior for Airbnb use
Retain major load-bearing walls and central circulation routes
Color Scheme
Use approved historical color palette
No ...
Get the Whole Paper!
Not exactly what you need?
Do you need a custom essay? Order right now:
👀 Other Visitors are Viewing These APA Essay Samples:
-
The future of organization and work
14 pages/≈3850 words | 1 Source | Harvard | Accounting, Finance, SPSS | Essay |
-
eassy
7 pages/≈1925 words | 5 Sources | Harvard | Accounting, Finance, SPSS | Essay |
-
Title: Unlocking Innovation: Exploring AI Integration in UK Fintech Startups
3 pages/≈825 words | No Sources | Harvard | Accounting, Finance, SPSS | Essay |