Essay Available:
page:
3 pages/โ825 words
Sources:
2
Style:
APA
Subject:
Accounting, Finance, SPSS
Type:
Coursework
Language:
English (U.S.)
Document:
MS Word
Date:
Total cost:
$ 16.85
Topic:
Cost Estimates for World Satellite Telephone Exchange Project
Coursework Instructions:
Instructions
Norwegian Satellite Development Company (NSDC)
Cost Estimates for World Satellite Telephone Exchange Project
NSDC has a contract to produce eight satellites to support a worldwide telephone system (for Alaska Telecom, Inc.) that allows individuals to use a single, portable telephone in any location on earth to call in and out. NSDC will develop and produce the eight units. NSDC has estimated that the R&D costs will be NOK (Norwegian Krone) 12,000,000. Material costs are expected to be NOK 6,000,000. They have estimated that the design and production of the first satellite will require 100,000 labor hours, and an 80 percent improvement curve is expected. Skilled labor cost is NOK 300 per hour. Desired profit for all projects is 25 percent of total costs.
How many labor hours should the eighth satellite require?
How many labor hours for the whole project of eight satellites?
What price would you ask for the project? Why?
Midway through the project, your design and production people realize that a 75 percent improvement curve is more appropriate. What impact does this have on the project?
Near the end of the project, Deutsch Telefon AG requests a cost estimate for four satellites identical to those you have already produced. What price will you quote them? Justify your price.
Instructions: In 600-750 words in length (not including the title page and reference page), analyze the case above. Provide calculations in an Appendix. The analysis must correlate concepts and problem-solving. Support your responses with at least two scholarly journal references. Refer to the Writing Assignment Grading Criteria below for requirements in content, organization, writing style, grammar, and APA 7.0 format. An APA template has been provided to help with organizing and presenting your assignment.
Refer to the following links for APA guidelines: APA Style Purdue OWL
Coursework Sample Content Preview:
Cost Estimates for the World Satellite Telephone Exchange Project
Studentโs Name
Institutional Affiliation
Cost Estimates for the World Satellite Telephone Exchange Project
Conducting an effective cost analysis and pricing strategy for a project can be vital in ensuring that the project reaches its set objectives within the outlined time frame. Superficially, both cost analysis and pricing strategies play a role in establishing the viability and suitability of a project, supporting strategic decision-making, and ensuring competitive pricing and market positioning, especially in a dynamic operational setting. To a more specific extent, the calculations can be critical in outlining what the stakeholders could foster in key project factors like research and development, costs of materials, as well as labor. This analysis focuses on the case of the Norwegian Satellite Development Company (NSDC) is contracted to produce eight satellites for Alaska Telecom, Inc. At its completion, the project should help to steer global portable telephone connectivity. Assessing the costs and pricing strategies in this project should help NSDC to make decisions on research and development, material costs, and labor while also considering the changes in the curve to affect the listed variables.
Project Variables
The NSDC project estimates are wide-ranging and must consider the changes in the operational setting. Principally, the focus is on strategizing for labor, materials, and R&D. However, those estimates are within the anticipated improvement curve of 80%, which led to a profit goal of 25% of the total cost. However, the project is subject to dynamism. That is, mid-way through the project, NSDC realizes that an improvement curve of 75% will be more suitable for the project. Additionally, NSDC has had contact from Deutsch Telefon AG which has shown interest in acquiring 4 additional and identical satellites. The changes both in the number of satellites required as well as the adjustment of the improvement curve from 80% to 75% are poised to affect the key variables of the project like labor, R&D, and material costs. Hence, new and more befitting calculations are needed for all the variables.
Labor Hour Est...
Get the Whole Paper!
Not exactly what you need?
Do you need a custom essay? Order right now:
๐ Other Visitors are Viewing These APA Essay Samples:
-
Discussion
1 page/โ275 words | 3 Sources | APA | Accounting, Finance, SPSS | Coursework |
-
6-1 Discussion: Compromising Situation Listen
2 pages/โ550 words | No Sources | APA | Accounting, Finance, SPSS | Coursework |
-
1-1 Discussion: Introductions and GAAP Listen
1 page/โ275 words | No Sources | APA | Accounting, Finance, SPSS | Coursework |