100% (1)
page:
10 pages/≈2750 words
Sources:
-1
Style:
APA
Subject:
IT & Computer Science
Type:
Case Study
Language:
English (U.S.)
Document:
MS Word
Date:
Total cost:
$ 60.75
Topic:

Database Management System of Kacynest Testing Agency

Case Study Instructions:

YOU WILL NEED TO EDIT THE PAPER ACCORDING TO THE REVISION INSTRUCTIONS.







you will carry out a database development project with a real or fictitious client / company of your choosing.

To the extent possible, you should follow all steps of the Systems Development Lifecycle. In general terms, the goal of this project is to develop a database system to fulfill a business need based on the goals and objectives of your client’s company.



Workload: Your project should consist of roughly 140 hours of effort. Projects with workloads that are either significantly higher or lower will not be approved.



Milestones / Deliverables:



The following chart lists the milestones / deliverables that are required. The dates associated with each deliverable should be on your schedule. Descriptions of each deliverable is below.



Case Study Cover Sheet

Case Study Detailed Proposal

Detailed Requirements Specification

Logical Design

Entity Relationship Diagram Approval is required prior to proceeding to next phase.

Physical Design

Data Dictionary

Architecture Plan Approval of data dictionary is required prior to proceeding to next phase.

Implementation

Final Project Package









REVISION BASED ON THE INSTRUCTIONS: FILE TO EDIT => 00123529.docx (63kB)





Hello, dear!



I see that you had many ideas placed here. This is great. However, you might want to improve it more.



There are 1740 words in the document. However, the approximate number of words required is 2750 words. Kindly add more words and expound on some of the ideas where necessary.



The instruction says: Please identify whether your project is based on a real situation or fictitious initially. (PLease specify this on your document.)



The instruction says: If you are creating a front-end interface to your system (an application), note that in this section. (If it does, you might want to check on this, too.)



The document does not jive 100% to the Case Study Detailed Proposal structure and of the Project Guide and the template. You may enlighten me about this and revise it, too, if needed. I am basing on the template given.



The preliminary schedule needs an entry. There is no indicated reference list under the reading list. Kindly include this; otherwise, the client asked you to do this.



Thank you!









the complete work it involves all these



1.cover sheet

2. Detailed Proposal

3.Detailed Requirements Specification

Logical Design

4.Entity Relationship Diagram

Physical Design

5.Data Dictionary

6.Architecture Plan

Implementation

7.Final Project Package



Case Study Sample Content Preview:
Proposal Date: ___________
AIT CASE STUDY COVER SHEET
477520050800Course AIT 710 AIT 715 AIT 720 AIT 725 AIT 730 AIT 735Course AIT 710 AIT 715 AIT 720 AIT 725 AIT 730 AIT 735
Student Name:
Semester:
Case Study Title:
Advisor Name:
Abstract:
This project aims to design a Database Management System to offer Kacynest Testing Agency with a practical way of doing the testing process. The database application is adaptable and well-optimized to help help in reducing manual testing done by individuals using computers, while effectuating the test by carefully following necessary procedures. This integrated database is designed and purposed to allow data entry, process data into information, and produce authentic reports. Moreover, the data management system will help in accelerating excecution of the testing procedures, while automating the tedious tasks of testers and reducing human labour in the testing process. Hence, the database application not only enhance testing efficiency but also offer an amazing end-user experience and giving out the most reliable reports.
One of the approved Testing Agencies is the Kacynest in Boston Massachusetts. This company hires many skilled employees under the leadership of an effectual management team who always aim to deliver the best services and make the organization standout. The company works hard to achieve its goals, including primarily guaranteeing exceptional customer satisfaction and promote their employees’ skills through training and development strategies. However, the Kacynest agency had been able to meet its goals. The main reason for not achieving its targets is inconvenient existing system which had been facing several challenges, rendering the company’s structures ineffective to meet its needs.
The main problems with the existing system include high-level of manual transactions, extended testing execution period, reduced data processing and information delivery capabilities, and inability to execute testing procedures on various platforms. Since every department of the Kacynest agency has its own database, it was difficult for the offices to share data. These factors limited the company from achieving its target, and it was essential for the management to work out on strategies to mitigate the situation. Therefore, this case study is intended to help Testing Agencies, including Kacynest to overcome such limitations by implementing an integrated database system. The integrated system will enhance productivity, information processing efficiency and minimize costs, and ensure delivery of precise and coherent data. The project employs all SDLC phases. In the implementation of the project, some provisions are made that will allow system improvement in the future.
Past Courses: Please list all courses completed and currently taking. It is a must to meet the necessary requirements for you to register for a case study.
Number

Name

Semester

Grade

AIT 600

Information Technology Infrastructure



AIT 610

Systems Development Process
1190500FOR OFFICE USE ONLYProposal Approved: Report Received: FOR OFFICE USE ONLYProposal Approved: Report Received:
DATABASE MANAGEMENT SYSTEM IMPLEMENTATION CASE STUDY TO AUTOMATE SYSTEM PRACTICES FOR INTERNATIONAL TESTING SERVICE
Problem Description
The automated testing deals with automatic assessing and analysing competency of an individual in a specific subject. It presents a practical solution if the company or testing agency is dealing with mass evaluation with numerous unique features that cannot be handled by manual or paper-based systems. The examination testing industry is highly competitive; thus, many companies and agencies in the business are facing uncommon pressure to enhance speed of tests execution, conduct thorough assessments more often, and ensure efficiency of the testing process. The main objective is to have an integrated system that guarantees customer satisfaction and ensure their agency processes and structures in sales and services are effiecient enough to meet the company’s needs. Currently, the testing agency has a manual prcessinng syatem which is more tedious, involving high volumes of data entry, inconsistencies, inexact reports, high costs of data processing, and information or reports insecurity issues.
The Kacynest service should primarily consider implementing a database system that offer efficiency of operations , minimize tedious tasks, and enhance testing experience. To achieve its goals on customer satisfaction and efficiency of operations, the management team will thoroughly analyze the new system to ensure it orients to the company’s targets. The new system comes with several novel features to help in enhancing assessment accuracy, stamp out examination irregularities, and offer quick feedback while enhancing efficiency. In short, the new system will facilitate Kacynest with tools essential in data collection, analysis, management and distribution to help in administering tests to individuals from different geographical locations and in different times. Since the database system contains special programs and aspects for data safety and efficiency, it allows the organization to restrain examination leakage, eliminate human erros in test evaluation and exam scores’ recording. With this new database system everything is simplified; processes become automatic, from tests to marking and evaluation to production of tests reports. Therefore, the new system will elimibnate all mundane paperwork.
System features and capabilities
* Forms for online registration
* Roles and Permissions that are Configurable
* Test integrated rubrics
* Configurable permission and roles
* Notifications of test schedules
* Customizable test options
* Online payment options
* Reports and dashboards
* Real-time monitoring system
* Auto-grading system
* Instant report generation
Justification of the problem
Analysis of a case study entails evaluation of specific issue to find out the existing prblems and develop effective interventions and best possible strategies to attain the desired results. This case study needs an establishment od a complete test assessment system with a powerful Data Management System. By establishing a test assessment and data management systems, the Kacynest can thoroughly analyze the new database system to determine its feasibility in offering testing requirements to achieve company’s primary goals. The database application will embody worthy functional and non-functional capabilities to ensure it meets particular client’s requirements and capable of performing specific sets of tasks.
This project is ideal since it provides learners with the opportunity to practice whatever they learned theoretically in class and enhance their proficiency in theoretical topics covered in class, including database, DBMS, system analysis and design, documentation, networks, and process of requirement specification. Learners can easily learn these topics through the implementation of this project and become more proficient in company database management. After conducting the project, learners will have enough knowledge on how to implement various language database components and the database management systems. Therefore, this project serves as a mechanism to equip learners with practical capabilities and proficiency for further management tasks. Actually, this is a comprehensive package consisting of many different aspects such as specific system requirement identification, system mechanisms delivery, and overcoming database development and system administration challenges learnt in the AIT course.
Purpose
The system is an essential tool for any test or examination assessment agency. It allows international testing agency to administer automated tests to individuals from several locations worldwide at a time. Notably, the system eliminates manual data collection and all paperworks, and it is time- saving since it allows the testing agency to execute testing processes regardless of region and time; thus, doing away with the need to wait for results. Hence, results are automatically generated by the server from the integrated system. Agency administrators can create, modify, and completely delete the examinaton or test questions on the database application. On the other hand, users are allowed to register, log in the system, access the tests in the provided interface, do the test questions within the time provided, and see results immediately.
Feasibility study
The client, Kacynest agency requires an online application or platform that will stop all the challeges mentioned earlier above, eliminate manual paperwork, offer consistency and fast processing of data, allow recording, modifying, and deletion of records. The viability of the proposed implementation of the database appliction was assessed by comparing its cost, required effort and time, and labour to the current system. The new database system will comprise a self-contained interface that will not require data assessment from different application. Therefore, this will ensure every testing process is quick in a single interface, and it will save costs of integrating and running other data-assessing application.
Moreover, since the case study’s main purpse is academic excellence, it will be an important reading to equip learners with required productivity tools; thus, ensuring they have adequate knowledge in the database management ...
Updated on
Get the Whole Paper!
Not exactly what you need?
Do you need a custom essay? Order right now:

👀 Other Visitors are Viewing These APA Essay Samples:

Sign In
Not register? Register Now!